Email #74 - NW Studios with Interior Walls

Here are two more photos taken Friday Feb. 23 showing the state of completion of the NW studios on the second floor.

In the lower photo you can see two of the six or so steel columns to be exposed at finish. The architects say there are only four columns to be exposed at finish (two on top floor, two on bottom floor). However they are not counting the columns exposed within the closet spaces, like where the red ladder is. However, this closet column is the most exposed - on all four sides - not just two. That column is visible, barely, to the left of the red ladder. In a later email, I'll send a close-up view.

The "publicly available" exposed steel column can seen on the right in the hallway (bottom photo).

John Stamets
Feb. 25, 2007

See also #70 and #75